Wiki

Scale Your Enterprise

User Tools

Site Tools


bw:workflow_schedules_new

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
bw:workflow_schedules_new [2020/06/26 11:35]
akoehler [Run Times Tab]
bw:workflow_schedules_new [2020/06/26 11:36] (current)
akoehler [Run Times Tab]
Line 68: Line 68:
       * The From and To times can only be selected within a given date and cannot span multiple dates/days       * The From and To times can only be selected within a given date and cannot span multiple dates/days
         * **Example:** Run Every 7 Min From 02:00 AM To 04:00 AM. The first run of the workflow will be at 2:00 AM. It will run every 7 min within the hour until there is no available time left within that hour. Regardless of when this last 7 min interval occurs in the hour (2:56 AM) it will resume at the beginning of the next hour (3:00 AM). The nature of From/To ranges that span hours is that the interval restarts at the beginning of every hour.          * **Example:** Run Every 7 Min From 02:00 AM To 04:00 AM. The first run of the workflow will be at 2:00 AM. It will run every 7 min within the hour until there is no available time left within that hour. Regardless of when this last 7 min interval occurs in the hour (2:56 AM) it will resume at the beginning of the next hour (3:00 AM). The nature of From/To ranges that span hours is that the interval restarts at the beginning of every hour. 
-      * **Important Note:** From/To ranges are inclusive of the last hour in the range. In the above example the 7 min interval will continue through the 4:00 AM hour.+        * **Important Note:** From/To ranges are inclusive of the last hour in the range. In the above example the 7 min interval will continue through the 4:00 AM hour.
       * **Minutes** - Can choose from 5 to 59 minutes as an interval        * **Minutes** - Can choose from 5 to 59 minutes as an interval 
         * Note the interval period cannot be longer than the From To period         * Note the interval period cannot be longer than the From To period
bw/workflow_schedules_new.1593185739.txt.gz · Last modified: 2020/06/26 11:35 by akoehler