Wiki

Scale Your Enterprise

User Tools

Site Tools


bw2:workflow_schedules_new

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
bw2:workflow_schedules_new [2024/01/08 11:54]
wgates [Run Times Tab]
bw2:workflow_schedules_new [2024/01/08 12:08] (current)
wgates [Notes Tab]
Line 75: Line 75:
         * Note the interval period cannot be longer than the From-To period         * Note the interval period cannot be longer than the From-To period
       * **Do Not Run Between** - defines a period that the workflow will not run within any given schedule.       * **Do Not Run Between** - defines a period that the workflow will not run within any given schedule.
-{{ :bw2:bizweaverschedules10.png |}}+{{ :bw2:runevery.png?|}}
  
 ====== Exclusions Tab ====== ====== Exclusions Tab ======
Line 83: Line 83:
     * Clicking the add button adds another exclusion.      * Clicking the add button adds another exclusion. 
     * When the exclusion date has passed the "X" will change to red.     * When the exclusion date has passed the "X" will change to red.
-{{ :bw2:bizweaverschedules11.png |}}+{{ :bw2:exclusion.png|}}
 ====== Notes Tab ====== ====== Notes Tab ======
 This tab allows notes to be entered for a schedule. This tab allows notes to be entered for a schedule.
-{{ :bw2:bizweaverschedules12.png |}}+{{ :bw2:notes.png |}}
 ====== Notifications Tab (2.7.8) ====== ====== Notifications Tab (2.7.8) ======
  
bw2/workflow_schedules_new.1704732890.txt.gz ยท Last modified: 2024/01/08 11:54 by wgates