This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
bw:workflow_schedules_new [2020/06/26 10:10] akoehler [Schedule Tab] |
bw:workflow_schedules_new [2020/06/26 11:36] (current) akoehler [Run Times Tab] |
||
|---|---|---|---|
| Line 21: | Line 21: | ||
| * 4. **Schedule Type** | * 4. **Schedule Type** | ||
| * **Recurring** - defines the occurrence of a workflow over multiple days | * **Recurring** - defines the occurrence of a workflow over multiple days | ||
| - | * **One-Time** - defines the occurrence of a workflow on a single day | + | * **Single Day** - defines the occurrence of a workflow on a single day |
| * When running a One-Time schedule the scheduler display will change, and only one date can be selected this will be the date the schedule runs. Below are the tabs that will be displayed for modification. | * When running a One-Time schedule the scheduler display will change, and only one date can be selected this will be the date the schedule runs. Below are the tabs that will be displayed for modification. | ||
| * [[bw: | * [[bw: | ||
| Line 56: | Line 56: | ||
| * **Example** the 1st day of Every 1 Month will run once a month on the first day of that month. | * **Example** the 1st day of Every 1 Month will run once a month on the first day of that month. | ||
| * The Option - Can select the First, Second, Third, Forth, and Last of a month selecting the Day or Weekday option, or a specific day of the week. | * The Option - Can select the First, Second, Third, Forth, and Last of a month selecting the Day or Weekday option, or a specific day of the week. | ||
| - | | + | |
| ====== Run Times Tab ====== | ====== Run Times Tab ====== | ||
| * 1. **Run At** defines a specific time a schedule should run during a day. | * 1. **Run At** defines a specific time a schedule should run during a day. | ||
| Line 67: | Line 67: | ||
| * Bizweaver uses the indicated interval period (ex. 5 mins, 12, mins, 20 minutes, i.e. whatever the user enters) calculated out from the selected From time to determine the actual first run of the workflow within the selected From-To range. | * Bizweaver uses the indicated interval period (ex. 5 mins, 12, mins, 20 minutes, i.e. whatever the user enters) calculated out from the selected From time to determine the actual first run of the workflow within the selected From-To range. | ||
| * The From and To times can only be selected within a given date and cannot span multiple dates/days | * The From and To times can only be selected within a given date and cannot span multiple dates/days | ||
| - | * **Example: | + | * **Example: |
| + | * **Important Note:** From/To ranges are inclusive of the last hour in the range. In the above example the 7 min interval | ||
| * **Minutes** - Can choose from 5 to 59 minutes as an interval | * **Minutes** - Can choose from 5 to 59 minutes as an interval | ||
| * Note the interval period cannot be longer than the From To period | * Note the interval period cannot be longer than the From To period | ||