Wiki

Scale Your Enterprise

User Tools

Site Tools


bw2:workflow_schedules_new

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
bw2:workflow_schedules_new [2024/01/08 11:26]
wgates [Creating a Schedule]
bw2:workflow_schedules_new [2024/01/08 12:08] (current)
wgates [Notes Tab]
Line 45: Line 45:
 {{ :bw2:bizweaverschedules4.png |}} {{ :bw2:bizweaverschedules4.png |}}
   * 3. The options in this section change depending on the type of schedule selected.   * 3. The options in this section change depending on the type of schedule selected.
-      * **Daily** \\ {{ :bw2:bizweaverschedules5.png |}}+      * **Daily** \\ {{ :bw2:daily.png|}}
  
 ---- ----
  
-      * **Weekly** \\ {{ :bw2:bizweaverschedules6.png |}}+      * **Weekly** \\ {{ :bw2:weekly.png|}}
  
 ---- ----
  
-      *  **Monthly** \\ {{ :bw2:bizweaverschedules7.png |}}+      *  **Monthly** \\ {{ :bw2:monthly.png|}}
       * Day Option - Can select a day within a month to run for a select interval of months.        * Day Option - Can select a day within a month to run for a select interval of months. 
         * **Example** the 1st day of Every 1 Month will run once a month on the first day of that month.         * **Example** the 1st day of Every 1 Month will run once a month on the first day of that month.
Line 60: Line 60:
 ====== Run Times Tab ====== ====== Run Times Tab ======
   * 1. **Run At** defines a specific time a schedule should run during a day.   * 1. **Run At** defines a specific time a schedule should run during a day.
-{{ :bw2:bizweaverschedules8.png |}}+{{ :bw2:runat.png|}}
   * 2. **Run Continuously** defines a schedule running all day during the selected schedule type.   * 2. **Run Continuously** defines a schedule running all day during the selected schedule type.
-{{ :bw2:bizweaverschedules9.png |}}+{{ :bw2:continuously.png|}}
  
   * 3. **Run Every** defines a schedule running during a set interval of time   * 3. **Run Every** defines a schedule running during a set interval of time
Line 75: Line 75:
         * Note the interval period cannot be longer than the From-To period         * Note the interval period cannot be longer than the From-To period
       * **Do Not Run Between** - defines a period that the workflow will not run within any given schedule.       * **Do Not Run Between** - defines a period that the workflow will not run within any given schedule.
-{{ :bw2:bizweaverschedules10.png |}}+{{ :bw2:runevery.png?|}}
  
 ====== Exclusions Tab ====== ====== Exclusions Tab ======
Line 83: Line 83:
     * Clicking the add button adds another exclusion.      * Clicking the add button adds another exclusion. 
     * When the exclusion date has passed the "X" will change to red.     * When the exclusion date has passed the "X" will change to red.
-{{ :bw2:bizweaverschedules11.png |}}+{{ :bw2:exclusion.png|}}
 ====== Notes Tab ====== ====== Notes Tab ======
 This tab allows notes to be entered for a schedule. This tab allows notes to be entered for a schedule.
-{{ :bw2:bizweaverschedules12.png |}} +{{ :bw2:notes.png |}} 
-====== Notifications Tab ======+====== Notifications Tab (2.7.8) ======
  
 <WRAP center round tip 60%> <WRAP center round tip 60%>
bw2/workflow_schedules_new.1704731218.txt.gz · Last modified: 2024/01/08 11:26 by wgates